留言板

尊敬的读者、作者、审稿人, 关于本刊的投稿、审稿、编辑和出版的任何问题, 您可以本页添加留言。我们将尽快给您答复。谢谢您的支持!

姓名
邮箱
手机号码
标题
留言内容
验证码

黄土地层锁脚锚管横向地基反力系数

陈丽俊,  陈建勋,  罗彦斌,  王传武,  胡涛涛

陈丽俊, 陈建勋, 罗彦斌, 王传武, 胡涛涛. 黄土地层锁脚锚管横向地基反力系数[J]. 交通运输工程学报, 2021, 21(4): 106-115. doi: 10.19818/j.cnki.1671-1637.2021.04.007
引用本文: 陈丽俊, 陈建勋, 罗彦斌, 王传武, 胡涛涛. 黄土地层锁脚锚管横向地基反力系数[J]. 交通运输工程学报, 2021, 21(4): 106-115. doi: 10.19818/j.cnki.1671-1637.2021.04.007
CHEN Li-jun, CHEN Jian-xun, LUO Yan-bin, WANG Chuan-wu, HU Tao-tao. Lateral foundation reaction coefficient of feet-lock pipe in loess stratum[J]. Journal of Traffic and Transportation Engineering, 2021, 21(4): 106-115. doi: 10.19818/j.cnki.1671-1637.2021.04.007
Citation: CHEN Li-jun, CHEN Jian-xun, LUO Yan-bin, WANG Chuan-wu, HU Tao-tao. Lateral foundation reaction coefficient of feet-lock pipe in loess stratum[J]. Journal of Traffic and Transportation Engineering, 2021, 21(4): 106-115. doi: 10.19818/j.cnki.1671-1637.2021.04.007

黄土地层锁脚锚管横向地基反力系数

doi: 10.19818/j.cnki.1671-1637.2021.04.007
基金项目: 

国家自然科学基金项目 41831286

国家自然科学基金项目 51808049

详细信息
    作者简介:

    陈丽俊(1986-),男,山西运城人,长安大学讲师,工学博士,从事软弱地层隧道工程研究

    通讯作者:

    陈建勋(1969-),男,陕西韩城人,长安大学教授,工学博士

  • 中图分类号: U452

Lateral foundation reaction coefficient of feet-lock pipe in loess stratum

Funds: 

National Natural Science Foundation of China 41831286

National Natural Science Foundation of China 51808049

More Information
Article Text (Baidu Translation)
  • 摘要: 以马兰组黄土地层锁脚锚管为例,开展了锁脚锚管的模拟加载试验,反算了锁脚锚管横向地基反力系数的比例系数,研究了横向地基反力系数的比例系数随锁脚锚管端部竖向荷载和位移的变化规律,分析了锁脚锚管打设角度对横向地基反力系数的影响;拟合了横向地基反力系数的比例系数随锁脚锚管端部竖向位移变化的回归方程,确定了横向地基反力系数的比例系数的上下限,通过插值计算了0°~30°范围内任意角度打设的锁脚锚管的横向地基反力系数的比例系数。分析结果表明:在加载初期,随着锁脚锚管端部竖向荷载和位移的增大,锁脚锚管周围黄土处于不断压密阶段,横向地基反力系数的比例系数迅速增大;当锁脚锚管周围黄土进入渐进破坏阶段后,横向地基反力系数的比例系数随锁脚锚管端部竖向荷载和位移的增大不断减小;相对于0°打设的锁脚锚管,以30°打设的锁脚锚管的横向地基反力系数的比例系数随锁脚锚管端部竖向荷载和位移的变化幅值明显减小;在进行马兰组黄土地层隧道锁脚锚管设计计算中,直径为51 mm的锁脚锚管采用0°~30°打设时,横向地基反力系数的比例系数的取值范围为66.9~296·1 MN·m-4;单根直径51 mm的锁脚锚管能承受的竖向荷载为8.63~11.87 kN。

     

  • 图  1  隧道锁脚锚管

    Figure  1.  Feet-lock pipes used in tunnel

    图  2  隧道施工中打设的锁脚锚管

    Figure  2.  Feet-lock pipes installed during tunnel construction

    图  3  锁脚锚管模拟加载试验场地

    Figure  3.  Test site of simulated loading of feet-lock pipe

    图  4  锁脚锚管模拟加载

    Figure  4.  Simulated loading of feet-lock pipe

    图  5  锁脚锚管现场模拟加载

    Figure  5.  On-site simulated loading of feet-lock pipe

    图  6  锁脚锚管端部位移测量

    Figure  6.  Measurement of displacement at end of feet-lock pipe

    图  7  锁脚锚管端部竖向位移随荷载的变化曲线

    Figure  7.  Variation curves of vertical displacement with load atend of feet-lock pipe

    图  8  加载结束后锁脚锚管的变形情况

    Figure  8.  Deformations of feet-lock pipes after loading

    图  9  0°打设的锁脚锚管孔口周围土体变形

    Figure  9.  Deformation of soil around borehole of feet-lockpipe installed at 0°

    图  10  锁脚锚管弹性地基梁模型

    Figure  10.  Elastic foundation beam model of feet-lock pipe

    图  11  F-m关系曲线

    Figure  11.  F-m relationship curves

    图  12  yv- m关系曲线

    Figure  12.  yv- m relationship curves

    图  13  m随yv变化的回归分析结果

    Figure  13.  Regression analysis results of m changing with yv

    表  1  土层基本物理力学参数

    Table  1.   Basic physical and mechanical parameters of soil

    参数名称 参数值 参数名称 参数值
    重度/(kN·m-3) 16.7 弹性模量/MPa 31.0
    黏聚力/kPa 35 内摩擦角/(°) 22.0
    液性指数 -1.08 粗粒组含量/% 35.9
    塑性指数 10.8 细粒组含量/% 64.1
    下载: 导出CSV

    表  2  m的反算结果

    Table  2.   Inverse calculation result of m

    打设角度/(°) 荷载/kN m/(MN·m-4) 端部竖向位移/mm
    计算值 实测值
    0 1.08 93.8 -5.04 -5
    2.16 239.0 -6.01 -6
    3.24 296.1 -8.01 -8
    4.32 280.1 -11.01 -11
    5.40 239.2 -15.01 -15
    6.48 180.9 -21.02 -21
    7.55 141.8 -28.02 -28
    8.63 99.5 -39.00 -39
    30 1.08 84.5 -4.01 -4
    2.16 197.8 -5.00 -5
    3.24 224.0 -7.00 -7
    4.32 197.2 -10.02 -10
    5.40 183.2 -13.04 -13
    6.48 157.2 -17.03 -17
    7.55 154.6 -20.03 -20
    8.63 131.7 -25.04 -25
    9.71 66.9 -41.08 -41
    下载: 导出CSV
  • [1] 陈建勋, 王梦恕, 轩俊杰, 等. 两车道公路黄土隧道变形规律[J]. 交通运输工程学报, 2012, 12(3): 9-18. http://transport.gfscw.cn/oa/DArticle.aspx?type=view&id=201203002

    CHEN Jian-xun, WANG Meng-shu, XUAN Jun-jie, et al. Deformation rule of loess highway tunnel with two lanes[J]. Journal of Traffic and Transportation Engineering, 2012, 12(3): 9-18. (in Chinese) http://transport.gfscw.cn/oa/DArticle.aspx?type=view&id=201203002
    [2] 李骏, 邵生俊, 李国良, 等. 黄土隧道的湿陷变形规律及其对衬砌结构的作用[J]. 岩石力学与工程学报, 2018, 37(1): 251-260. http://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201801025.htm

    LI Jun, SHAO Sheng-jun, LI Guo-liang, et al. Collapse deformation of loess tunnel and its effect[J]. Chinese Journal of Rock Mechanics and Engineering, 2018, 37(1): 251-260. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201801025.htm
    [3] 陈建勋, 陈丽俊, 罗彦斌, 等. 大跨度绿泥石片岩隧道大变形机理与控制方法[J]. 交通运输工程学报, 2021, 21(2): 93-106. http://transport.gfscw.cn/oa/DArticle.aspx?type=view&id=202102008

    CHEN Jian-xun, CHEN Li-jun, LUO Yan-bin, et al. Mechanism and control method of large deformation for large-span chlorite schist tunnel[J]. Journal of Traffic and Transportation Engineering, 2021, 21(2): 93-106. (in Chinese) http://transport.gfscw.cn/oa/DArticle.aspx?type=view&id=202102008
    [4] 陈丽俊, 陈建勋, 罗彦斌, 等. 深埋大跨度绿泥石片岩隧道变形规律及合理预留变形量[J]. 中国公路学报, 2021, 34(6): 147-157. http://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL202106015.htm

    CHEN Li-jun, CHEN Jian-xun, LUO Yan-bin, et al. Deformation law and reasonable reserved deformation of deep large-span chlorite schist tunnel[J]. China Journal of Highway and Transport, 2021, 34(6): 147-157. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL202106015.htm
    [5] LI Peng-fei, ZHAO Yong, ZHOU Xiao-jun. Displacement characteristics of high-speed railway tunnel construction in loess ground by using multi-step excavation method[J]. Tunnelling and Underground Space Technology, 2016, 51: 41-55. doi: 10.1016/j.tust.2015.10.009
    [6] 陈建勋, 王超, 罗彦斌, 等. 高含水量土质隧道不设系统锚杆的试验研究[J]. 岩土工程学报, 2010, 32(5): 815-820. http://www.cnki.com.cn/Article/CJFDTOTAL-YTGC201005032.htm

    CHEN Jian-xun, WANG Chao, LUO Yan-bin, et al. Experimental research on high-water-content soul tunnel without systematic bolts[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(5): 815-820. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-YTGC201005032.htm
    [7] 魏龙海, 王明年, 赵东平, 等. 翔安海底公路隧道陆域段变形控制措施研究[J]. 岩土力学, 2010, 31(2): 577-581, 587. doi: 10.3969/j.issn.1000-7598.2010.02.040

    WEI Hai-long, WANG Ming-nian, ZHAO Dong-ping, et al. Study of deformation controlling measures for large-span shallow tunnel[J]. Rock and Soil Mechanics, 2010, 31(2): 577-581, 587. (in Chinese) doi: 10.3969/j.issn.1000-7598.2010.02.040
    [8] LUO Yan-bin, CHEN Jian-xun, HUANG Pei, et al. Deformation and mechanical model of temporary support sidewall in tunnel cutting partial section[J]. Tunnelling and Underground Space Technology, 2017, 61: 40-49. doi: 10.1016/j.tust.2016.09.007
    [9] LAI Jin-xing, WANG Xiu-ling, QIU Jun-ling, et al. Extreme deformation characteristics and countermeasures for a tunnel in difficult grounds in southern Shaanxi, China[J]. Environmental Earth Sciences, 2018, 77(19): 706. doi: 10.1007/s12665-018-7888-2
    [10] LUO Yan-bin, CHEN Jian-xun, WANG Hong-yu, et al. Deformation rule and mechanical characteristics of temporary support in soil tunnel constructed by sequential excavation method[J]. KSCE Journal of Civil Engineering, 2017, 21(6): 2439-2449. doi: 10.1007/s12205-016-0978-3
    [11] 张海太, 任高攀, 万志文, 等. 薄层炭质板岩地层隧道围岩大变形特征及支护方法研究[J]. 地下空间与工程学报, 2020, 16(增1): 457-464. http://www.cnki.com.cn/Article/CJFDTOTAL-BASE2020S1068.htm

    ZHANG Hai-tai, REN Gao-pan, WAN Zhi-wen, et al. Study on large deformation characteristics and support patterns of thin layer carbonaceous slate tunnel[J]. Chinese Journal of Underground Space and Engineering, 2020, 16(S1): 457-464. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-BASE2020S1068.htm
    [12] 陈文尹. 大断面黄土隧道变形控制技术措施及适用性研究[J]. 现代隧道技术, 2018, 55(增2): 138-144. http://www.cnki.com.cn/Article/CJFDTOTAL-XDSD2018S2017.htm

    CHEN Wen-yin. Study on the deformation control measures and its applicability in large section loess tunnel[J]. Modern Tunnelling Technology, 2018, 55(S2): 138-144. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-XDSD2018S2017.htm
    [13] 郝玉强, 赵东平. 山岭隧道洞口施工技术优化探讨[J]. 现代隧道技术, 2012, 49(增): 47-51. http://cpfd.cnki.com.cn/Article/CPFDTOTAL-OGTY201210003010.htm

    HAO Yu-qiang, ZHAO Dong-ping. Discussion on optimization of construction technology of mountain tunnel entrance[J]. Modern Tunnelling Technology, 2012, 49(S): 47-51. (in Chinese) http://cpfd.cnki.com.cn/Article/CPFDTOTAL-OGTY201210003010.htm
    [14] 李志伟, 管国梁, 王佳戈, 等. 黄土隧道锁脚锚杆对支护体系的影响[J]. 工程技术研究, 2018(14): 86-87. doi: 10.3969/j.issn.1671-3818.2018.14.036

    LI Zhi-wei, GUAN Guo-liang, WANG Jia-ge, et al. Influence of feet-lock pipe of loess tunnel on supporting system[J]. Engineering and Technological Research, 2018(14): 86-87. (in Chinese) doi: 10.3969/j.issn.1671-3818.2018.14.036
    [15] 梁辉如, 王永东, 燕新, 等. 锁脚锚管-钢拱架在软岩隧道中的力学稳定性研究[J]. 北京交通大学学报, 2020, 44(4): 34-41. doi: 10.11860/j.issn.1673-0291.20190080

    LIANG Hui-ru, WANG Yong-dong, YAN Xin, et al. Research on mechanical stability of feet-lock pipe and steel arch in soft rock tunnel[J]. Journal of Beijing Jiaotong University, 2020, 44(4): 34-41. (in Chinese) doi: 10.11860/j.issn.1673-0291.20190080
    [16] CHEN Li-jun, CHEN Jian-xun, LUO Yan-bin, et al. Vertical load and settlement at the foot of steel rib with the support of feet-lock pipe in soft ground tunnel[J]. Advances in Civil Engineering, 2019, 2019: 6186748. http://www.researchgate.net/publication/330853288_Vertical_Load_and_Settlement_at_the_Foot_of_Steel_Rib_with_the_Support_of_Feet-Lock_Pipe_in_Soft_Ground_Tunnel
    [17] CHEN Li-jun, ZHANG Yun-liang, MA Zhen-yue. Analytical approach for support mechanism of feet-lock pipe combined with steel frame in weak rock tunnels[J]. KSCE Journal of Civil Engineering, 2016, 20(7): 2965-2980. doi: 10.1007/s12205-016-0443-3
    [18] 罗彦斌, 陈建勋. 软弱围岩隧道锁脚锚杆受力特性及其力学计算模型[J]. 岩土工程学报, 2013, 35(8): 1519-1525. http://www.cnki.com.cn/Article/CJFDTOTAL-YTGC201308021.htm

    LUO Yan-bin, CHEN Jian-xun. Mechanical characteristics and mechanical calculation model of tunnel feet-lock bolt in weak surrounding rock[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(8): 1519-1525. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-YTGC201308021.htm
    [19] 陈丽俊, 张运良. 锁脚锚管受力分析的双参数弹性地基梁模型[J]. 岩石力学与工程学报, 2016, 35(5): 989-999. http://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201605013.htm

    CHEN Li-jun, ZHANG Yun-liang. Double parameters elastic foundation beam model of feet-lock pipes[J]. Chinese Journal of Rock Mechanics and Engineering, 2016, 35(5): 989-999. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201605013.htm
    [20] 陈丽俊, 张运良, 马震岳. 锁脚锚管合理打设角度的理论研究[J]. 岩石力学与工程学报, 2015, 34(7): 1334-1344. http://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201507006.htm

    CHEN Li-jun, ZHANG Yun-liang, MA Zhen-yue. Theoretical research on reasonable installation angle of feet-lock pipes[J]. Chinese Journal of Rock Mechanics and Engineering, 2015, 34(7): 1334-1344. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201507006.htm
    [21] 谭勇, 施成华, 彭立敏, 等. 浅埋暗挖软基隧道分部开挖拱脚地基承载力研究[J]. 铁道标准设计, 2015, 59(2): 76-81. http://www.cnki.com.cn/Article/CJFDTOTAL-TDBS201502020.htm

    TAN Yong, SHI Cheng-hua, PENG Li-min, et al. Study on the bearing capacity at arch foot of shallow buried soft base tunnel with partial excavation[J]. Railway Standard Design, 2015, 59(2): 76-81. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-TDBS201502020.htm
    [22] KOBAYASHI N, SHIBATA T, KIKUCHI Y, et al. Estimation of horizontal subgrade reaction coefficient by inverse analysis[J]. Computers and Geotechnics, 2008, 35(4): 616-626. doi: 10.1016/j.compgeo.2007.11.002
    [23] ASHFORD S A, JUIRNARONGRIT T. Evaluation of pile diameter effect on initial modulus of subgrade reaction[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2003, 129(3): 234-242. doi: 10.1061/(ASCE)1090-0241(2003)129:3(234)
    [24] BAHRAMI A, NIKRAZ H. Effect of shaft diameter of pile on lateral Winkler spring stiffness[J]. Journal of Earthquake Engineering, 2012, 16(5): 595-606. doi: 10.1080/13632469.2011.653865
    [25] 王雨, 陈文化. 地层成层性对基床系数的影响分析[J]. 岩石力学与工程学报, 2017, 36(增2): 4304-4312. http://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2017S2067.htm

    WANG Yu, CHEN Wen-hua. Influence of soil stratification on coefficient of subgrade reaction[J]. Chinese Journal of Rock Mechanics and Engineering, 2017, 36(S2): 4304-4312. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2017S2067.htm
    [26] 于永堂, 唐浩. 西安黄土基床系数变化规律及其测试方法的相关性分析[J]. 岩石力学与工程学报, 2017, 36(10): 2563-2571. http://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201710025.htm

    YU Yong-tang, TANG Hao. Reaction coefficient of subgrade on Xi'an loess and correlation analysis of methods of measurement[J]. Chinese Journal of Rock Mechanics and Engineering, 2017, 36(10): 2563-2571. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201710025.htm
    [27] 刘陕南, 侯胜男, 蔡忠祥. m法计算单桩水平承载力在上海地区的适用性分析[J]. 岩土工程学报, 2013, 35(增2): 721-724. http://www.cnki.com.cn/Article/CJFDTOTAL-YTGC2013S2132.htm

    LIU Shan-nan, HOU Sheng-nan, CAI Zhong-xiang. Applicability of m-method for horizontal bearing capacity of single pile in Shanghai area[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(S2): 721-724. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-YTGC2013S2132.htm
    [28] 詹红志, 王亮清, 王昌硕, 等. 考虑滑床不同地基系数的抗滑桩受力特征研究[J]. 岩土力学, 2014, 35(增2): 250-256. http://www.cnki.com.cn/Article/CJFDTOTAL-YTLX2014S2035.htm

    ZHAN Hong-zhi, WANG Liang-qing, WANG Chang-shuo, et al. Study of mechanical characters of anti-sliding piles considering different foundation coefficients of sliding bed[J]. Rock and Soil Mechanics, 2014, 35(S2): 250-256. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-YTLX2014S2035.htm
    [29] 马志涛. 水平荷载下桩基受力特性研究综述[J]. 河海大学学报(自然科学版), 2006, 34(5): 546-551. doi: 10.3321/j.issn:1000-1980.2006.05.017

    MA Zhi-tao. Study on behavior of pile foundation under lateral loading[J]. Journal of Hohai University (Natural Sciences), 2006, 34(5): 546-551. (in Chinese) doi: 10.3321/j.issn:1000-1980.2006.05.017
    [30] 杨志刚, 肖伯强, 陈培帅, 等. 隧道三台阶开挖锁脚锚管倾角优化研究[J]. 人民长江, 2017, 48(16): 60-62, 72. http://www.cnki.com.cn/Article/CJFDTOTAL-RIVE201716013.htm

    YANG Zhi-gang, XIAO Bo-qiang, CHEN Pei-shuai, et al. Dip angle optimization of feet-lock bolt in tunnel constructed by three steps excavation[J]. Yangtze River, 2017, 48(16): 60-62, 72. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-RIVE201716013.htm
    [31] 初厚永. 短台阶弧形导坑法在浅埋大断面黄土隧道Ⅴ级围岩段中的应用[J]. 铁道标准设计, 2008(11): 69-73. doi: 10.3969/j.issn.1004-2954.2008.11.024

    CHU Hou-yong. Application of short step arc heading method in surrounding rock of level Ⅴ for shallow large-section loess tunnel[J]. Railway Standard Design, 2008(11): 69-73. (in Chinese) doi: 10.3969/j.issn.1004-2954.2008.11.024
  • 加载中
图(13) / 表(2)
计量
  • 文章访问数:  1432
  • HTML全文浏览量:  584
  • PDF下载量:  98
  • 被引次数: 0
出版历程
  • 收稿日期:  2021-02-14
  • 刊出日期:  2021-08-25

目录

    /

    返回文章
    返回