| Citation: | YAN Bin, DAI Gong-lian, DONG Lin-yu. Design parameters of track-bridge interaction on passenger dedicated line cable-stayed bridge[J]. Journal of Traffic and Transportation Engineering, 2012, 12(1): 31-37. doi: 10.19818/j.cnki.1671-1637.2012.01.006 |
| [1] |
BU Yi-zhi. Research on the transmission mechanism of longitudinal force for high-speed railway bridges[D]. Chengdu: Southwest Jiaotong University, 1998. (in Chinese).
|
| [2] |
XU Qing-yuan. Static and dynamic 3Dfinite element analysis of additional longitudinal forces transmission between CWR and high-speed railway bridges[D]. Changsha: Central South University, 2005. (in Chinese).
|
| [3] |
XU Qing-yuan, CHEN Xiu-fang, LI Shu-de. Study on the additional longitudinal forces transmission between continuously welded rails and high-speed railway bridges[J]. China Railway Science, 2006, 27(3): 8-12. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK200603001.htm
|
| [4] |
ZHANG Jian. ANSYS analysis and secondary exploitation of CWR on rigid frame bridge[D]. Changsha: Central South University, 2007. (in Chinese).
|
| [5] |
SONG M K, NOH H C, CHOI C K. A new three-dimensional finite element analysis model of high-speed train-bridge interactions[J]. Engineering Structures, 2003, 25(13): 1611-1626. doi: 10.1016/S0141-0296(03)00133-0
|
| [6] |
RUGE P, WIDARDA D R, SCHMALZLIN G, et al. Longi-tudinal track-bridge interaction due to sudden change of coup-ling interface[J]. Computers and Structures, 2009, 87(1/2): 47-58.
|
| [7] |
BATTINI J M, MAHIR U K. A simple finite element to consider the non-linear influence of the ballast on vibrations of railway bridges[J]. Engineering Structures, 2011, 33(9): 2597-2602. doi: 10.1016/j.engstruct.2011.05.005
|
| [8] |
YIN Cun-xin. Study on nonlinear static and dynamic analysis and emulation of additional longitudinal forces in railway bridges[D]. Beijing: China Academy of Railway Sciences, 2000. (in Chinese).
|
| [9] |
FREIRE A M S, NEGRAO J H O, LOPES A V. Geomet-rical nonlinearities on the static analysis of highly flexible steel cable-stayed bridges[J]. Computers and Structures, 2006, 84(31/32): 2128-2140.
|
| [10] |
DANIELL W E, MACDONALD J H G. Improved finite ele-ment modelling of a cable-stayed bridge through systematic manual tuning[J]. Engineering Structures, 2007, 29(3): 358-371. doi: 10.1016/j.engstruct.2006.05.003
|
| [11] |
Germany DS899/59, special procedures on railway Shinkansen bridge[S].
|
| [12] |
LIM N H, PARK N H, KANG Y J. Stability of continuous welded rail track[J]. Computers and Structures, 2003, 81(22/23): 2219-2236.
|
| [13] |
YAN Bin, DAI Gong-lian. Beam-track interaction on high-speed railway cable-stayed bridge[R]. Changsha: Central South University, 2011. (in Chinese).
|
| [14] |
RUGE P, BIRK C. Longitudinal forces in continuously welded rails on bridgedecks due to nonlinear track-bridge interaction[J]. Computers and Structures, 2007, 85(7/8): 458-475.
|
| [15] |
TB10002.1—2005, fundamental code for design on railway bridge and culvert[S].
|