| Citation: | LI Yan, ZHANG Wei-jiao, JIA Zhi-kai. Forecast method of annual senior overhaul amount for EMU[J]. Journal of Traffic and Transportation Engineering, 2013, 13(4): 102-107. doi: 10.19818/j.cnki.1671-1637.2013.04.015 |
| [1] |
LIU Gang, WANG Hua-sheng, WEN Li. High-speed train repair process and system technologies[J]. Chinese Railways, 2010 (12): 62-66. (in Chinese). doi: 10.3969/j.issn.1001-683X.2010.12.015
|
| [2] |
LIU Li-ying, LIU Ji-gang, LIU Ji. Study on maintenance system of electric multiple unit[J]. Journal of Tongji University: Natural Science, 2001, 29 (8): 121-124. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-TJDZ200108023.htm
|
| [3] |
HAN Zeng-li. Analysis of EMU maintenance performance[J]. Railway Locomotive and Car, 2011, 31 (3): 90-92. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-TDJC201103030.htm
|
| [4] |
WU Zhuang-sheng, ZHAO Qing, WANG Bo-ming. Operation and maintenance of high speed trains[J]. Journal of Southwest Jiaotong University, 2006, 32 (3): 277-282. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-XNJT703.008.htm
|
| [5] |
KUANG Shuang-qin. Maintenance bases and maintenance analysis of EMU[J]. Industrial and Science Tribune, 2011, 10 (2): 90-91. (in Chinese). doi: 10.3969/j.issn.1673-5641.2011.02.054
|
| [6] |
ZHANG Jian-cheng. Deciding the maintenance cycle of locomotive by equivalent kilometers[J]. Railway Locomotive and Rolling Stock Workers, 2005 (6): 10-12. (in Chinese). doi: 10.3969/j.issn.1007-6042.2005.06.004
|
| [7] |
ZHAO Zhong-xi. Study of mathematical model on electric locomotive equivalent kilometers[J]. Railway Locomotive and Car, 2005, 25 (S): 46-47. (in Chinese). http://cpfd.cnki.com.cn/Article/CPFDTOTAL-ZGTD200511002012.htm
|
| [8] |
WANG Rui-feng, LUO Yang, YAN Jun, et al. Study of locomotive equivalent model based on artificial neural network[J]. Diesel Locomotives, 2008 (3): 11-14. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-LRJX200803002.htm
|
| [9] |
QI Jin-ping, SONG Wei, LI Hong-liang, et al. Application of genetic algorithm-based binary decision tree method to mathematical model for equivalent locomotive running kilometers[J]. Diesel Locomotives, 2010 (2): 13-15, 19. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-LRJX201002005.htm
|
| [10] |
HUANG Hong-zhong, TONG Xin, ZUO Ming-jian. Posbist fault tree analysis of coherent systems[J]. Reliability Engineering and System Safety, 2004, 84 (2): 141-148.
|
| [11] |
QI Jin-ping, SHI Ya-juan, YANG Tuan-ming. Study of forecast for railway locomotive overhaul cycle on fuzzy fault tree[J]. Journal of Lanzhou Jiaotong University, 2010, 29 (3): 62-66. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-LZTX201003014.htm
|
| [12] |
BAE C, KOO T, SON Y, et al. A study on reliability centered maintenance planning of a standard electric motor unit subsystem using computational techniques[J]. Journal of Mechanical Science and Technology, 2009, 23 (4): 1157-1168.
|
| [13] |
ZHANG Cai-chun, CHEN Jian-hua, HUA Wei. Research on the EMU operation plan based on different maintenance capacity[J]. China Railway Science, 2010, 31 (5): 130-133. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201005024.htm
|
| [14] |
SHI Feng, ZHOU Wen-liang, YU Yu-wei, et al. Optimized model and algorithm of motor train-sets scheduling for dedicated passenger lines[J]. Journal of the China Railway Society, 2011, 33 (1): 8-13. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201101004.htm
|
| [15] |
WANG Ying, LIU Jun, MIAO Jian-rui. Column generation algorithms based optimization method for maintenance scheduling of multiple unit[J]. China Railway Science, 2010, 31 (2): 115-120. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201002026.htm
|
| [16] |
WANG Zhong-kai, SHI Tian-yun, ZHANG Wei-jiao, et al. Model and algorithm for the integrative scheduling of EMU utilization plan and maintenance plan[J]. China Railway Science, 2012, 33 (3): 102-108. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201203018.htm
|
| [17] |
CHEN Yan. Model and algorithm for making overhaul plan of EMUs[J]. Railway Computer Application, 2013, 22 (1): 22-24. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-TLJS201301009.htm
|