WANG Li-feng, WANG Er-qiang, SUN Yong-cun, HE Dong-po, GE Jun-ying. Mechanical properties of ten thousand-ton class cable-stayed bridge in rotation construction process[J]. Journal of Traffic and Transportation Engineering, 2015, 15(3): 52-61. doi: 10.19818/j.cnki.1671-1637.2015.03.007
Citation: WANG Li-feng, WANG Er-qiang, SUN Yong-cun, HE Dong-po, GE Jun-ying. Mechanical properties of ten thousand-ton class cable-stayed bridge in rotation construction process[J]. Journal of Traffic and Transportation Engineering, 2015, 15(3): 52-61. doi: 10.19818/j.cnki.1671-1637.2015.03.007

Mechanical properties of ten thousand-ton class cable-stayed bridge in rotation construction process

doi: 10.19818/j.cnki.1671-1637.2015.03.007
More Information
  • Author Bio:

    WANG Li-feng (1971-), male, associate professor, PhD, + 86-451-82191545, computerwlf@126.com

    HE Dong-po(1962-), male, professor, +86-451-82190403, hdp@nefu.edu.cn

  • Received Date: 2015-03-01
  • Publish Date: 2015-06-25
  • In order to reveal the mechanical properties of each component of cable-stayed bridge in rotation construction process, the 3D numerical simulation model of the first domestic single-point flat-hinge cable-stayed bridge of China was built, and was verified by using the measured data. The angular acceleration of cable-stayed bridge in rotation construction process was deduced according to the theory of rigid body rotation around a fixed axle. In view of two typical construction stages of accelerating rotation and uniform rotation, the stress states of main girder, tower, pier, bracket, shaft and dial were researched. In the rotation process of cable-stayed bridge, the influence laws of angular velocity and angular acceleration on bridge stress were revealed, and the reasonable construction angular velocity and angular acceleration were calculated. Calculation result indicates that in the process of uniform rotation, the normal stress change of control section is approximately direct proportional to the square of angular velocity. When the measured angular velocity is 0.01 rad · min-1, the maximum stress changing value of control section is only -2.00 Pa. In the process of accelerating rotation, the stress of main girder cross section presents skew symmetric distribution along the center line of main girder, and when the measured angular acceleration is 6.5 × 10-3 rad · s-2, the stress changing value of tower root solid section at lower edge is -3.33 MPa, and the stress changes significantly. In the process of accelerating rotation, start from the bracket bottom, the torque of each pier cross section along the height direction decreases. So in the process of uniform rotation, the influence of angular velocity on the stress of main girder section may be ignored. In the process of accelerating rotation, in order to ensure the construction safety and shorten the rotation time, the rotation angular acceleration of cable-stayed bridge should be limited.

     

  • loading
  • [1]
    WU Hai-jun, LIU Jian, ZHANG Lei. Friction effect of girder of horizontal swing continuous beam bridge in cast-in-site construction[J]. Journal of Chongqing Jiaotong University: Natural Science, 2013, 32(2): 183-186. (in Chinese) doi: 10.3969/j.issn.1674-0696.2013.02.02
    [2]
    CHE Xiao-jun, ZHANG Xie-dong, ZHU Hai-qing. Estimation of unbalancing torque of rotationally erected T-frame bridge based on ball joint stress difference method[J]. Bridge Construction, 2014, 44(4): 57-61. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-QLJS201404010.htm
    [3]
    DU Jia-jun. Innovation and prospect on bridge construction technology of rotation method[J]. Railway Construction Technology, 2012(4): 7-11. (in Chinese) doi: 10.3969/j.issn.1009-4539.2012.04.002
    [4]
    ZHANG Jian-feng, ZHONG Qi-bin. The achievement and development of bridge construction under level rotation[J]. Railway Standard Design, 1992(6): 19-28, 41. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-TDBS199206002.htm
    [5]
    CHEN Bao-chun, SUN Chao, CHEN You-jie. Application and development of swing method of bridge construction in China[J]. Journal of Highway and Transportation Research and Development, 2001, 18(2): 24-28. (in Chinese) doi: 10.3969/j.issn.1002-0268.2001.02.007
    [6]
    SIWOWSKI T, WYSOCKI A. Horizontal rotation via floatation as an accelerated bridge construction for long-span footbridge erection: case study[J]. Journal of Bridge Engineering, 2015, 20(4): 1-9.
    [7]
    SAⅡDI M S, VOSOOGHI A, NELSON R B. Shake-table studies of a four-span reinforced concrete bridge[J]. Journal of Structural Engineering, 2013, 139(8): 1352-1361. doi: 10.1061/(ASCE)ST.1943-541X.0000790
    [8]
    FUCHS N, TOMLINSON K, BUCKBY R. El Ferdan Bridge, Egypt: the world's longest swing bridge[J]. Proceedings of the Institution of Civil Engineers, 2003(156): 21-30.
    [9]
    TONG Ji-yang, ZHENG Zhou-jun. Simulation calculation of rotation platform piers of Gusaoshu Road Viaduct in Wuhan City[J]. Bridge Construction, 2013, 43(2): 64-69. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-QLJS201302012.htm
    [10]
    CHE Xiao-jun, ZHANG Xie-dong. Anti-overturning in swivel process of large tonnage T-rigid frame bridge[J]. China Journal of Highway and Transport, 2014, 27(8): 66-72. (in Chinese) doi: 10.3969/j.issn.1001-7372.2014.08.009
    [11]
    GUO Zi-yi, CHEN Xiao-jia, ZHENG Shu-yue, et al. Research on swivel construction counterweight methods for swivel bridges[J]. Highway Engineering, 2014, 39(3): 73-76, 82. (in Chinese) doi: 10.3969/j.issn.1674-0610.2014.03.017
    [12]
    WEI Feng, CHEN Qiang, MA Lin. Twist unbalanced weigh test analysis of cable-stayed bridge in the Five Ring Road of Beijing City[J]. Railway Engineering, 2005(4): 4-6. (in Chinese) doi: 10.3969/j.issn.1003-1995.2005.04.002
    [13]
    ZHU He-yi. Twist unbalanced weigh test analysis of cable-stayed bridge[J]. Sichuan Building Science, 2012, 38(3): 66-70. (in Chinese) doi: 10.3969/j.issn.1008-1933.2012.03.015
    [14]
    CHEN Yue. Study of aerodynamic effect of high-speed passing train and its effect on cable-stayed bridge crossing the line[D]. Changsha: Central South University, 2013. (in Chinese)
    [15]
    GUO Ya-juan, LI Hong-zhe. Force research for turntable of rotating cable-stayed bridge in Zoucheng[J]. Journal of China and Foreign Highway, 2013, 33(1): 119-122. (in Chinese) doi: 10.3969/j.issn.1671-2579.2013.01.027
    [16]
    DAI Gong-lian, SU Miao, LIU Wen-shuo, et al. Stress analysis of pier-tower-girder fixed region of cable-stayed bridge with trough girder[J]. Journal of Hunan University: Natural Sciences, 2014, 41(1): 27-32. (in Chinese) doi: 10.3969/j.issn.1008-1763.2014.01.005
    [17]
    SHI Di. Overall design of a railway crossing flyover on Wuhan Second Ring Road[J]. World Bridges, 2015, 43(1): 7-10, 47. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-GWQL201501005.htm
    [18]
    ATES S. Numerical modelling of continuous concrete box girder bridges considering construction stages[J]. Applied Mathematical Modelling, 2011, 35(8): 3809-3820. doi: 10.1016/j.apm.2011.02.016
    [19]
    WATANABE E, MARUYAMA T, TANAKA H, et al. Design and construction of a floating swing bridge in Osaka[J]. Marine Structures, 2000, 13(4/5): 437-458.
    [20]
    LIAO Xiao-xiong, HUANG Yan, GUO Ben, et al. Simulation and analysis of construction state of cable-stayed bridge based on ANSYS[J]. Journal of Wuhan University of Technology: Transportation Science and Engineering, 2006, 30(3): 496-499. (in Chinese) doi: 10.3963/j.issn.2095-3844.2006.03.035
    [21]
    GAO Chen-yan. Analysis of dynamic response of the continuous girder bridge with ANSYS[D]. Xi'an: Chang'an University, 2008. (in Chinese)
    [22]
    YAN Yi, DU Peng, GAO Ying-zuo, et al. Method of bridge construction process analysis in ANSYS[J]. Journal of Chongqing Jiaotong University: Natural Science, 2007, 26(S): 18-21. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-CQJT2007S1007.htm
    [23]
    BROWNJOHN J M W, LEE J, CHEONG B. Dynamic performance of a curved cable-stayed bridge[J]. Engineering Structures, 1999, 21(11): 1015-1027. doi: 10.1016/S0141-0296(98)00046-7
    [24]
    LOZANO-GALANT J A, PAÝA-ZAFORTEZA I, XU D, et al. Analysis of the construction process of cable-stayed bridges built on temporary supports[J]. Engineering Structures, 2012(40): 95-106.
    [25]
    WANG Dong-sheng, WU Tie-jun. Reinforced concrete units in ANSYS software[J]. Journal of Wuhan University of Technology: Transportation Science and Engineering, 2004, 28(4): 526-529. (in Chinese) http://www.cnki.com.cn/Article/CJFDTOTAL-JTKJ200404015.htm