| Citation: | SHEN Jian-feng. Temporal-spatial features of probability distribution of vertical irregularity in ballasted track[J]. Journal of Traffic and Transportation Engineering, 2019, 19(6): 45-53. doi: 10.19818/j.cnki.1671-1637.2019.06.005 |
| [1] |
WANG Jian-xi, LI Hai-feng, XU Yu-de. Evaluation and prediction method for railway track geometric state based on probability distribution change[J]. China Railway Science, 2008, 29(5): 31-34. (in Chinese). doi: 10.3321/j.issn:1001-4632.2008.05.006
|
| [2] |
GAO Jian-min, ZHAI Wan-ming, XU Yong, et al. Development forecast model of track irregularity based on probability distribution[J]. Journal of Railway Science and Engineering, 2006, 3(6): 55-60. (in Chinese). doi: 10.3969/j.issn.1672-7029.2006.06.011
|
| [3] |
GAO Jian-min. Study on settlement of railway ballasted track and growth forecast of track vertical profile irregularity[D]. Chengdu: Southwest Jiaotong University, 2008. (in Chinese).
|
| [4] |
ZHANG Yu-jiang, EL-SIBAIE M, LEE S, FRA track quality indices and distribution characteristics[C]//AREMA. 2004 AREMA Annual Conference. Nashville: AREMA, 2004: 1-26.
|
| [5] |
EL-SIBAIE M, ZHANG Yu-jiang. Objective track quality indices[J]. Transportation Research Record, 2004(1863): 81-87.
|
| [6] |
OYAMA T, MIWA M. Mathematical modeling analyses for obtaining an optimal railway track maintenance schedule[J]. Japan Journal of Industrial and Applied Mathematics, 2006, 23(2): 207-224. doi: 10.1007/BF03167551
|
| [7] |
JOVANOVIC S. Railway track quality assessment and related decision making[C]//IEEE. 2004 IEEE International Conference on Systems, Man and Cybernetics. New York: IEEE, 2004: 5038-5043.
|
| [8] |
SADEGHI J, ASKARINEJAD H. Development of improved railway track degradation models[J]. Structure and Infrastructure Engineering, 2010, 6(6): 675-688. doi: 10.1080/15732470801902436
|
| [9] |
SADEGHI J, ASKARINEJAD H. An investigation into the effects of track structural conditions on railway track geometry deviations[J]. Proceedings of the Institution of Mechanical Engineers Part F: Journal of Rail and Rapid Transit, 2009, 223(4): 415-425. doi: 10.1243/09544097JRRT266
|
| [10] |
SADEGHI J. Development of railway track geometry indexes based on statistical distribution of geometry data[J]. Journal of Transportation Engineering, 2010, 136(8): 693-700. doi: 10.1061/(ASCE)0733-947X(2010)136:8(693)
|
| [11] |
SADEGHI J, AKBARI B. Field investigation on effects of railway track geometric parameters on rail wear[J]. Journal of Zhejiang University—Science A: Applied Physics and Engineering, 2006, 7(11): 1846-1855.
|
| [12] |
GULER H, JOVANOVIC S, EVREN G. Modelling railway track geometry deterioration[J]. Proceedings of the Institution of Civil Engineers—Transport, 2011, 164(2): 65-75. doi: 10.1680/tran.2011.164.2.65
|
| [13] |
XU Yu-de, LI Hai-feng, ZHOU Yu. Forecast methods of track longitudinal level irregularity[J]. Journal of Tongji University (Natural Science), 2003, 31(3): 291-295. (in Chinese). doi: 10.3321/j.issn:0253-374X.2003.03.009
|
| [14] |
XU Yu-de, ZHOU Yu. Statistics analysis of distribution of track quality index and weight coefficient of track irregularity[J]. China Railway Science, 2006, 27(4): 71-75. (in Chinese). doi: 10.3321/j.issn:1001-4632.2006.04.014
|
| [15] |
ZHOU Yu, XU Yu-de, LI Hao-ran. Nonlinear track irregularity forecast model[J]. Journal of Traffic and Transportation Engineering, 2004, 4(4): 21-24. (in Chinese). doi: 10.3321/j.issn:1671-1637.2004.04.006
|
| [16] |
MU Dong-sheng, ZHOU Yu, HAN Yan-bin, et al. Effect of track comprehensive maintenance on geometry irregularity improvement of ballast track in high-speed railway[J]. Journal of Traffic and Transportation Engineering, 2018, 18(5): 90-99. (in Chinese). doi: 10.3969/j.issn.1671-1637.2018.05.009
|
| [17] |
PATRA A P, SODERHOLM P, KUMAR U. Uncertainty estimation in railway track life-cycle cost: a case study from Swedish National Rail Administration[J]. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2009, 223(3): 285-293. doi: 10.1243/09544097JRRT235
|
| [18] |
ANDRADE A R, TEIXEIRA P F. A Bayesian model to assess rail track geometry degradation through its life-cycle[J]. Research in Transportation Economics, 2012, 36(1): 1-8. doi: 10.1016/j.retrec.2012.03.011
|
| [19] |
MEIER-HIRMER C, RIBOULET G, SOURGET F, et al. Maintenance optimization for a system with a gamma deterioration process and intervention delay: application to tract maintenance[J]. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 2009, 223(3): 189-198. doi: 10.1243/1748006XJRR234
|
| [20] |
MERCIER S C, MEIER-HIRMER C, ROUSSIGNOL M. Bivariate Gamma wear processes for track geometry modelling, with application to intervention scheduling[J]. Structure and Infrastructure Engineering, 2012, 8(4): 357-366. doi: 10.1080/15732479.2011.563090
|
| [21] |
QUIROGA L M, SCHNIEDER E. Modelling of high speed railroad geometry ageing as a discrete-continuous process[C]//SMTDA. Stochastic Modeling Techniques and Data Analysis International Conference. Chania: SMTDA, 2010: 655-666.
|
| [22] |
QUIROGA L M, SCHNIEDER E. Monte Carlo simulation of railway track geometry deterioration and restoration[J]. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 2012, 226(3): 274-282. doi: 10.1177/1748006X11418422
|
| [23] |
ANDRADE A R, TEIXEIRA P F. Uncertainty in rail-track geometry degradation: Lisbon-Oporto Line case study[J]. Journal of Transportation Engineering, 2011, 137(3): 193-200. doi: 10.1061/(ASCE)TE.1943-5436.0000206
|
| [24] |
ANDRADE A R, TEIXEIRA P F. Hierarchical Bayesian modelling of rail track geometry degradation[J]. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2013, 227(4): 364-375. doi: 10.1177/0954409713486619
|
| [25] |
VALE C, LURDES S M. Stochastic model for the geometrical rail track degradation process in the Portuguese Railway Northern Line[J]. Reliability Engineering and System Safety, 2013, 116: 91-98. doi: 10.1016/j.ress.2013.02.010
|
| [26] |
AUDLEY M, ANDREWS J D. The effects of tamping on railway track geometry degradation[J]. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2013, 227(4): 376-391. doi: 10.1177/0954409713480439
|
| [27] |
ANDREWS J. A modelling approach to railway track asset management[J]. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2013, 227(1): 56-73.
|
| [28] |
PRESCOTT D, ANDREWS J. A track ballast maintenance and inspection model for a rail network[J]. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 2013, 227(3): 251-266.
|
| [29] |
ANDREWS J, PRESCOTT D, DE ROZIÈRES F. A stochastic model for railway track asset management[J]. Reliability Engineering and System Safety, 2014, 130: 76-84.
|
| [30] |
PRESCOTT D, ANDREWS J. Investigating railway track asset management using a Markov analysis[J]. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2015, 229(4): 402-416.
|
| [31] |
LESTOILLE N. Stochastic model of high-speed train dynamics for the prediction of long-time evolution of the track irregularities[D]. Paris: Université Paris-Est. 2015.
|
| [32] |
XU Lei, ZHAI Wan-ming. Track irregularity probabilistic model[J]. Journal of Traffic and Transportation Engineering, 2018, 18(3): 56-63. (in Chinese). http://transport.gfscw.cn/article/id/201803006
|