| Citation: | LIN Chun-jiao, ZHENG Jie-lian. Four-working-platform pouring method for main arch ring concrete of rigid skeleton arch bridge[J]. Journal of Traffic and Transportation Engineering, 2020, 20(6): 82-89. doi: 10.19818/j.cnki.1671-1637.2020.06.007 |
| [1] |
ZHENG Jie-lian. New development tendency of large-span reinforced concrete arch bridge in China[J]. Journal of Chongqing Jiaotong University (Natural Science), 2016, 35(S1): 8-11. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-CQJT2016S1002.htm
|
| [2] |
CHEN Bao-chun, LIU Jun-ping. Review of construction and technology development of arch bridges in the world[J]. Journal of Traffic and Transportation Engineering, 2020, 20(1): 27-41. (in Chinese). doi: 10.19818/j.cnki.1671-1637.2020.01.002
|
| [3] |
ZHENG Jie-lian, WANG Jian-jun. Concrete-filled steel tube arch bridges in China[J]. Engineering, 2018, 4(1): 143-155. doi: 10.1016/j.eng.2017.12.003
|
| [4] |
ZHENG Jie-lian, WANG Jian-jun, MOU Ting-min, et al. Feasibility study on design and construction of concrete filled steel tubular arch bridge with a span of 700 m[J]. Strategic Study of CAE, 2014, 16(8): 33-37. (in Chinese). doi: 10.3969/j.issn.1009-1742.2014.08.004
|
| [5] |
ZHAO Ren-da, ZHANG Zheng-yang. A summary of development of concrete-filled steel tube framed arch bridges in China[J]. Bridge Construction, 2016, 46(6): 45-50. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-QLJS201606010.htm
|
| [6] |
YOU Yun-chuan, GUO Lun-bo. The research on design of the stiff skeleton of long-span arch bridge[J]. Transportation Science and Technology, 2019(2): 5-8, 12. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-SKQB201902002.htm
|
| [7] |
CHEN Bao-chun, WANG T L. Overview of concrete filled steel tube arch bridges in China[J]. Practice Periodical on Structural Design and Construction, 2009, 14(2): 70-80. doi: 10.1061/(ASCE)1084-0680(2009)14:2(70)
|
| [8] |
HU Nan, DAI Gong-lian, YAN Bin, et al. Recent development of design and construction of medium and long span high-speed railway bridges in China[J]. Engineering Structures, 2014, 74: 233-241. doi: 10.1016/j.engstruct.2014.05.052
|
| [9] |
WEI Jian-gang, CHEN Bao-chun. Application and research advancement of long span concrete arch bridges abroad[J]. World Bridges, 2009(2): 4-8. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-GWQL200902002.htm
|
| [10] |
KANG Chong-jie, SCHNEIDER S, WENNER M, et al. Development of design and construction of high-speed railway bridges in Germany[J]. Engineering Structures, 2018, 163: 184-196. doi: 10.1016/j.engstruct.2018.02.059
|
| [11] |
JOHN J S. Construction of the Hoover Dam Bypass[J]. Concrete International, 2011, 33(2): 30-35.
|
| [12] |
GOODYEAR D. Design of the New Mike O'callaghan Pat Tillman Memorial Bridge at Hoover Dam[C]∥AMES D, DROESSLER T L, HOIT M. Structures Congress 2011. Reston: ASCE, 2011: 1806-1815.
|
| [13] |
KEATON J R. Earthquake ground motion for design of Hoover Dam Bypass Bridge (US Highway 93)[C]∥YEGIAN M K, KAVAZANJIAN E. Proceedings of Geotechnical Engineering for Transportation Projects. Reston: ASCE, 2004: 1721-1728.
|
| [14] |
GRANATA M F, MARGIOTTA P, RECUPERO A, et al. Partial elastic scheme method in cantilever construction of concrete arch bridges[J]. Journal of Bridge Engineering, 2013, 18(7): 663-672. doi: 10.1061/(ASCE)BE.1943-5592.0000396
|
| [15] |
GAO Yu-feng, PU Qian-hui, LI Xiao-bin, et al. Application and development of cantilever casting method for construction of long span concrete arch bridges abroad[J]. World Bridges, 2008(1): 18-21. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-GWQL200801005.htm
|
| [16] |
CANDRLIC V, RADIC J, GUKOV I. Research of concrete arch bridges up to 1 000 m in span[C]//ROCA P, OÑATE E. Proceedings of the 4th International Conference on Arch Bridge. Barcelona: CMNE, 2004: 538-547.
|
| [17] |
HU Da-lin, CHEN Ding-shi, ZHAO Xiao-you, et al. Construction control of cantilever casting of long span reinforced concrete arch bridge[J]. Journal of Traffic and Transportation Engineering, 2016, 16(1): 25-36. (in Chinese). doi: 10.3969/j.issn.1671-1637.2016.01.004
|
| [18] |
TROYANO L F. Procedures for the construction of large concrete arches[C]//ROCA P, OÑATE E. Proceedings of the 4th International Conference on Arch Bridge. Barcelona: CMNE, 2004: 54-64.
|
| [19] |
LIU Zhong-ren, CHENG Mao-fang. Construction of 180 m-span flat-turn reinforced concrete arch bridge with balancing weight[J]. Urban Roads Bridges and Flood Control, 2019(1): 115-117. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-CSDQ201901039.htm
|
| [20] |
FENG Cong. Discussion on Yun-Gui Railway Nanpanjiang Grand CFST Arch Bridge construction technology[J]. Railway Construction Technology, 2012(8): 77-80. (in Chinese). doi: 10.3969/j.issn.1009-4539.2012.08.021
|
| [21] |
ZHENG Yi-xin, ZHANG Hong-kun. Study on construction control of the stiff skeleton of Beipanjiang Long Span Bridge on Shanghai-Kunming High-Speed Railway[J]. Journal of Railway Science and Engineering, 2015, 12(3): 496-501. (in Chinese). doi: 10.3969/j.issn.1672-7029.2015.03.007
|
| [22] |
SHI Yong-liang. Stability research on horizontal rotation construction of long-span box-arch bridge with concrete-filled steel tube stiff skeleton[J]. Railway Engineering, 2020, 60(7): 34-37. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-TDJZ202007008.htm
|
| [23] |
WANG Xiao-fei. Analysis on pouring scheme of surrounding concrete for railway large span arch bridge with stiff skeleton[J]. Railway Engineering, 2020, 60(5): 11-14, 29. (in Chinese). doi: 10.3969/j.issn.1003-1995.2020.05.03
|
| [24] |
REN Wei-dong. Research on the key construction technology of the Lancang River Super Major Bridge of Dali-Ruili Railway[J]. Railway Standard Design, 2021, DOI: 10.13238/j.issn.1004-2954.202007040006.(in Chinese).
|
| [25] |
YU Chang-bin. Construction technology on concrete cable-stayed and buckle-hanging combined with the ring-section of large-span arch bridge's arch ring[J]. Railway Construction Technology, 2016(6): 1-4. (in Chinese). doi: 10.3969/j.issn.1009-4539.2016.06.001
|
| [26] |
ZHENG Jie-lian. Discussion on placing concrete uninterruptedly on closure arch rigid skeleton[J]. Journal of Chongqing Jiaotong University (Natural Science), 2011, 30(S2): 1099-1105, 1158. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-CQJT2011S2005.htm
|
| [27] |
LIN Chun-jiao, ZHENG Jie-lian. Analysis of construction of main arch rib concrete of Nanpan River Bridge using fastening stay method[J]. Bridge Construction, 2016, 46(5): 116-121. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-QLJS201605023.htm
|
| [28] |
LIN Chun-jiao, ZHENG Jie-lian, LI Xiang, et al. Structural stress adjustment of arch rib of Nanpan River Long-Span Bridge with diagonal stay cables[J]. Journal of Guangxi University (Natural Science Edition), 2017, 42(1): 274-283. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-GXKZ201701035.htm
|
| [29] |
ZHANG Fu-gui, ZHANG Yong-shui, DONG Yi, et al. Outscourcing concrete pouring scheme of long-span stiff skeleton arch bridge[J]. Journal of Chongqing Jiaotong University (Natural Science), 2012, 31(2): 210-213, 238. (in Chinese). http://www.cnki.com.cn/Article/CJFDTOTAL-CQJT201202011.htm
|
| [30] |
WU Hai-jun, WANG Miao-min, LIU Ping. Influence of pouring cycle schemes of externally wrapped concrete of concrete arch bridge with stiff skeleton on structure mechanics[J]. Journal of Chongqing Jiaotong University (Natural Science), 2017, 36(11): 1-6. (in Chinese). doi: 10.3969/j.issn.1674-0696.2017.11.01
|